Q.A vertical off-shore structure is built to withstand a maximum stress of . Is the structure suitable for putting up on top of an oil well in the ocean? Take the depth of the ocean to be roughly , and ignore ocean currents.
You're viewing a preview — the full solution, concept, methods & PYQ mapping are locked.
Start your 14-day free trial to unlock the full solution →The key idea is to compare the hydrostatic pressure at the ocean floor (due to the water column above) with the structure’s maximum stress tolerance. The pressure at 3 km depth is about , which is far less than . So the structure is suitable.
1. What is the structure actually experiencing?
When you place a vertical structure on the ocean floor, the main force it must withstand is the hydrostatic pressure of the water column above it. This pressure acts equally from all sides at a given depth (Pascal’s principle), pushing inward on the structure. The structure’s material has a maximum stress it can bear — here given as — which is essentially the pressure it can tolerate before failing.
The question is: does the pressure at 3 km depth exceed this limit? If yes, the structure would be crushed. If no, it’s safe.
A common mistake is to think the structure must support the weight of the water above it like a column. But hydrostatic pressure is not the same as weight — it’s the force per unit area exerted by the fluid, and it acts omnidirectionally. The structure’s stress tolerance is directly comparable to this pressure.
2. Calculate the hydrostatic pressure at depth
The pressure due to a fluid column of height is given by:
where:
- = density of seawater ≈ (slightly denser than fresh water)
- = acceleration due to gravity ≈
- = depth =
Plug in the numbers:
First, . Then .
So:
You can remember the rule of thumb: every 10 m of water adds roughly 1 atm of pressure (≈ ). At 3000 m, that gives about — a quick sanity check that matches our calculation.
3. Compare with the structure’s limit …
Unlock everything free for 14 days
- Full step-by-step solutions
- Concept-first explanations
- Methods, shortcuts & mistakes
- PYQ mapping + timed mock tests
Full access for 14 days. No credit card required.