The following table shows the total cost schedule of a firm. What is the total fixed cost schedule of this firm? Calculate the , , , and schedules of the firm.
| (Rs) | |
|---|---|
| 0 | 10 |
| 1 | 30 |
| 2 | 45 |
| 3 | 55 |
| 4 | 70 |
| 5 | 90 |
| 6 | 120 |
You're viewing a preview — the full solution, concept, methods & PYQ mapping are locked.
Start your 14-day free trial to unlock the full solution →This problem requires understanding and applying various short-run cost concepts to a given total cost schedule. The key is to first identify total fixed cost (TFC) at zero output, then derive total variable cost (TVC), and subsequently calculate average fixed cost (AFC), average variable cost (AVC), short-run average cost (SAC), and short-run marginal cost (SMC) using their respective formulas.
In the short run, a firm's total costs are divided into two main categories: fixed costs and variable costs. Understanding these distinctions is crucial for analyzing a firm's production decisions and profitability. Fixed costs are those expenses that do not change with the level of output in the short run, such as rent for factory space or salaries of permanent administrative staff. These costs are incurred even if the firm produces zero output. Variable costs, on the other hand, are expenses that vary directly with the level of output, such as raw material costs or wages for production workers. As output increases, variable costs increase, and as output decreases, they fall.
The total cost (TC) at any level of output is simply the sum of total fixed cost (TFC) and total variable cost (TVC). From these total cost figures, we can derive various per-unit costs, which provide insights into the efficiency of production. Average fixed cost (AFC) tells us the fixed cost per unit of output, average variable cost (AVC) tells us the variable cost per unit, and short-run average cost (SAC) gives the total cost per unit. Finally, short-run marginal cost (SMC) measures the change in total cost (or total variable cost) resulting from producing one additional unit of output.
Let's calculate each of these schedules step-by-step using the provided total cost data.
1. Total Fixed Cost (TFC) Schedule
Total Fixed Cost (TFC) is the cost incurred by the firm even when no output is produced. Looking at the given table, when the quantity () is 0, the Total Cost () is Rs 10. This Rs 10 represents the fixed cost of the firm, as it must be paid regardless of production. Since fixed costs do not change with output in the short run, the TFC will remain constant at Rs 10 for all levels of output.
Therefore, the TFC schedule is:
| (Rs) | |
|---|---|
| 0 | 10 |
| 1 | 10 |
| 2 | 10 |
| 3 | 10 |
| 4 | 10 |
| 5 | 10 |
| 6 | 10 |
2. Total Variable Cost (TVC) Schedule
Total Variable Cost (TVC) is the portion of total cost that changes with the level of output. It can be calculated by subtracting the Total Fixed Cost (TFC) from the Total Cost (TC) at each level of output.
Let's calculate TVC for each output level:
- For :
- For :
- For :
- For :
- For :
- For :
- For :
3. Average Fixed Cost (AFC) Schedule
Average Fixed Cost (AFC) is the fixed cost per unit of output. It is calculated by dividing Total Fixed Cost (TFC) by the quantity of output (). As output increases, the fixed cost is spread over more units, so AFC continuously declines.
AFC is undefined at because division by zero is not possible.
Let's calculate AFC for each output level:
- For : is undefined.
- For :
- For :
- For :
- For :
- For :
- For :
4. Average Variable Cost (AVC) Schedule
Average Variable Cost (AVC) is the variable cost per unit of output. It is calculated by dividing Total Variable Cost (TVC) by the quantity of output ().
AVC is undefined at .
Let's calculate AVC for each output level:
- For : is undefined.
- For :
- For :
- For :
- For :
- For :
- For :
5. Short-run Average Cost (SAC) Schedule
Short-run Average Cost (SAC), also known as Average Total Cost (ATC), is the total cost per unit of output. It can be calculated by dividing Total Cost (TC) by the quantity of output (), or by summing Average Fixed Cost (AFC) and Average Variable Cost (AVC).
SAC is undefined at .
Let's calculate SAC for each output level:
- For : is undefined.
- For : (or )
- For : (or )
- For : (or )
- For : (or )
- For : (or ) …
Unlock everything free for 14 days
- Full step-by-step solutions
- Concept-first explanations
- Methods, shortcuts & mistakes
- PYQ mapping + timed mock tests
Full access for 14 days. No credit card required.