Q.A person has undertaken a construction job. The probabilities are 0.65 that there will be strike, 0.80 that the construction job will be completed on time if there is no strike, and 0.32 that the construction job will be completed on time if there is a strike. Determine the probability that the construction job will be completed on time.

Kerala DhseKerala DHSE Plus Two Board 2026Subjective· 4mImportance★★★★★
0% · 0/165 Questions
🔒 Locked · start free trial →

You're viewing a preview — the full solution, concept, methods & PYQ mapping are locked.

Start your 14-day free trial to unlock the full solution →

Use the law of total probability: the job is completed on time either via the strike branch or the no-strike branch, weighted by how likely each branch is.

Let SS = "there is a strike" and TT = "job completed on time." Given:

P(S)=0.65⇒P(S′)=1−0.65=0.35,P(S)=0.65 \quad\Rightarrow\quad P(S')=1-0.65=0.35,

P(T∣S′)=0.80(on time, no strike),P(T\mid S')=0.80 \quad\text{(on time, no strike)},

P(T∣S)=0.32(on time, despite strike).P(T\mid S)=0.32 \quad\text{(on time, despite strike)}.

…

Unlock everything free for 14 days

  • Full step-by-step solutions
  • Concept-first explanations
  • Methods, shortcuts & mistakes
  • PYQ mapping + timed mock tests

Full access for 14 days. No credit card required.