Q.A company is manufacturing paper plates and bowls. It produces 1,00,000 plates and bowls each day. Due to local festival, it got an urgent order of extra 50,000 plates and bowls. Explain the method of recruitment that the company should adopt in the given circumstances to meet the order.

West Bengal WbchseTextbookSubjective· 3mImportance★★★★★
29% · 8/28 Questions
🔒 Locked · start free trial →

You're viewing a preview — the full solution, concept, methods & PYQ mapping are locked.

Start your 14-day free trial to unlock the full solution →

When a company faces a sudden, short-term spike in demand — like an extra 50,000 units during a festival — it should use external recruitment through a casual or temporary worker channel, because the need is urgent and temporary, not permanent.

The company in question runs a steady daily production of 1,00,000 paper plates and bowls. That means it already has a full workforce — machine operators, packers, quality checkers, supervisors — all working at normal capacity. Now, a local festival creates an urgent order for an additional 50,000 units. This is a classic case of fluctuation in demand: the extra work is real, but it will end once the festival passes. The company does not need to hire permanent staff; it needs hands on deck immediately and for a limited period.

This is where external recruitment becomes the right approach. External recruitment means looking outside the existing organisation for candidates. But within external recruitment, the company should choose a specific method: casual workers (also called temporary or contractual workers). Why? Because the situation demands speed, flexibility, and low long-term commitment.

Think about the alternatives. If the company tried to meet this order by asking its current employees to work overtime every day for weeks, they would face fatigue, lower quality, and possibly resistance. If it tried to promote or transfer someone internally, that would take time and disrupt existing roles. Neither works for a sudden, short burst of production.

So the company should go to the local labour market — perhaps through a contractor or a temporary staffing agency — and hire workers for the duration of the festival rush. These workers can be trained in a day or two for simple tasks like feeding raw material into machines, packing finished goods, or loading trucks. Once the order is fulfilled, their engagement ends. The company avoids the cost of permanent salaries, benefits, and retrenchment procedures.

Note

In the NCERT Class 12 Business Studies textbook, this is discussed under Sources of Recruitment. External sources include casual workers, who are hired on a daily-wage basis for a specific period. The textbook explicitly mentions that this method is suitable when there is a temporary increase in work.

Important

The key advantage here is speed. Internal recruitment would require advertising, interviews, and notice periods — all too slow for a festival deadline. External casual hiring can be arranged in hours or days through a local contractor. …

Unlock everything free for 14 days

  • Full step-by-step solutions
  • Concept-first explanations
  • Methods, shortcuts & mistakes
  • PYQ mapping + timed mock tests

Full access for 14 days. No credit card required.