Q.'RAVL' is a company manufacturing LED bulbs. To ensure efficiency in production, the workers are given monthly targets. For the month of October 2025, the workers were given a target to produce 8,000 bulbs. At the end of the month, it was found that actual production was only 6,000 bulbs. After investigation, it was found that the target was not met due to shortage of trained workers. To resolve the problem, the Production Manager arranged training programmes for workers and also hired additional workers. Which step of the controlling process was followed by the Production Manager to resolve the problem of shortage of trained workers ? (A) Setting performance standards (B) Measurement of actual performance (C) Comparing actual performance with standards (D) Taking corrective action
You're viewing a preview — the full solution, concept, methods & PYQ mapping are locked.
Start your 14-day free trial to unlock the full solution →The Production Manager's decision to arrange training programmes and hire additional workers represents taking corrective action, the final step in the controlling process that addresses deviations identified during performance review.
Management control is not a passive exercise of recording what went wrong. It is a dynamic, problem-solving process that closes the loop between planning and execution. When RAVL set a target of 8,000 bulbs for October, they established a performance standard. When they measured actual output at 6,000 bulbs, they identified a shortfall. The investigation that followed pinpointed the cause—shortage of trained workers. But none of this matters unless someone acts on the findings.
The controlling process unfolds in a logical sequence. First, standards are set (the 8,000-bulb target). Then actual performance is measured (the 6,000 bulbs produced). Next comes comparison, where the gap between standard and actual is analyzed and reasons are identified (the shortage of trained workers). Each of these steps is diagnostic—they tell you what happened and why. But the fourth step is therapeutic: it intervenes to fix the problem.
When the Production Manager arranged training programmes for existing workers and hired additional workers, he moved beyond analysis into action. This is the essence of taking corrective action. It involves:
- Identifying the root cause of the deviation (already done through investigation)
- Designing interventions that address that cause directly
- Implementing changes—whether in resources, processes, or personnel—to bring future performance back in line with standards
Training programmes upgrade the skill level of the existing workforce, while hiring brings in the numbers needed to meet production targets. Both are forward-looking corrections aimed at preventing the same shortfall in future months. …
Unlock everything free for 14 days
- Full step-by-step solutions
- Concept-first explanations
- Methods, shortcuts & mistakes
- PYQ mapping + timed mock tests
Full access for 14 days. No credit card required.