Exercise 7.3 · Q38
Q.The company makes concrete bricks made up of cement and sand. The weight of a concrete brick has to be at least 5 kg. Cement costs Rs.20 per kg. and sand costs Rs.6 per kg. Strength consideration dictate that a concrete brick should contain minimum 4 kg. of cement and not more than 2 kg. of sand. Form the L.P.P. for the cost to be minimum.
Maharashtra MsbshseTextbookSubjectiveImportance★★★★★est
38% · 38/100 Questions
You're viewing a preview — the full solution, concept, methods & PYQ mapping are locked.
Start your 14-day free trial to unlock the full solution →Let = kg of cement and = kg of sand used per brick. Let = kg of cement, = kg of sand. The non-negativity constraints are since a negative quantity produced has no meaning. The finished brick must weigh at least 5 kg, contain at least 4 kg of cement (strength requirement) and at most 2 kg of sand; cement costs Rs.20/kg and sand Rs.6/kg, and the total material cost is minimized. …
Unlock everything free for 14 days
- Full step-by-step solutions
- Concept-first explanations
- Methods, shortcuts & mistakes
- PYQ mapping + timed mock tests
Full access for 14 days. No credit card required.