Skip to content
Exercise 7.3 · Q38

Q.The company makes concrete bricks made up of cement and sand. The weight of a concrete brick has to be at least 5 kg. Cement costs Rs.20 per kg. and sand costs Rs.6 per kg. Strength consideration dictate that a concrete brick should contain minimum 4 kg. of cement and not more than 2 kg. of sand. Form the L.P.P. for the cost to be minimum.

Maharashtra MsbshseTextbookSubjectiveImportance★★★★★est
38% · 38/100 Questions
🔒 Locked · start free trial →

You're viewing a preview — the full solution, concept, methods & PYQ mapping are locked.

Start your 14-day free trial to unlock the full solution →

Let xx = kg of cement and yy = kg of sand used per brick. Let xx = kg of cement, yy = kg of sand. The non-negativity constraints are x≥0,y≥0x\ge0, y\ge0 since a negative quantity produced has no meaning. The finished brick must weigh at least 5 kg, contain at least 4 kg of cement (strength requirement) and at most 2 kg of sand; cement costs Rs.20/kg and sand Rs.6/kg, and the total material cost is minimized. …

Unlock everything free for 14 days

  • Full step-by-step solutions
  • Concept-first explanations
  • Methods, shortcuts & mistakes
  • PYQ mapping + timed mock tests

Full access for 14 days. No credit card required.