Skip to content
Question

Q.Read the case study given below and answer the questions from 15 to 17. Case Study : Indira Gandhi Canal (Nahar) Command Area Indira Gandhi Canal, previously known as the Rajasthan Canal, is one of the largest canal systems in India. Conceived by Kanwar Sain in 1948, the canal project was launched on 31 March, 1958. The canal originates at Harike barrage in Punjab and runs parallel to Pakistan border at an average distance of 40 km in Thar Desert (Marusthali) of Rajasthan. The total planned length of the system is 9,060 km catering to the irrigation needs of a total culturable command area of 19·63 lakh hectares. Out of the total command area, about 70 percent was envisaged to be irrigated by flow system and the rest by lift system. The construction work of the canal system has been carried out through two stages. The command area of Stage-I lies in Ganganagar, Hanumangarh and northern part of Bikaner districts. It has a gently undulating topography and its culturable command area is 5·53 lakh hectares. The command area of Stage-II is spread over Bikaner, Jaisalmer, Barmer, Jodhpur, Nagaur and Churu districts covering culturable command area of 14·10 lakh ha. It comprises desert land dotted with shifting sand dunes and temperature soaring to 50°C in summers. In the lift canal, the water is lifted up to make it to flow against the slope of the land. All the lift canals of Indira Gandhi system originate at the left bank of main canal while all the canals on the right bank of main canal are flow channels. Irrigation in Stage-I command area of the canal was introduced in early 1960s, whereas the command area of Stage-II began receiving irrigation in mid-1980s. The introduction of canal irrigation in this dry land has transformed its ecology, economy and society. It has influenced the environmental conditions of the region both positively as well as negatively. The availability of soil moisture for a longer period of time and various afforestation and pasture development programmes under CAD have resulted in greening the land. This has also helped in reducing wind erosion and siltation of canal systems. But the intensive irrigation and excessive use of water has led to the emergence of twin environmental problems of waterlogging and soil salinity. What was the main objective to construct of Indira Gandhi Canal ? (A) Proving water for irrigation in the command area (B) Providing water for drinking purpose (C) Providing water for afforestation (D) Providing water for industries

CBSECBSE Class XII Board 2023MCQ· 1mImportance★★★★★
🔒 Locked · start free trial →

You're viewing a preview — the full solution, concept, methods & PYQ mapping are locked.

Start your 14-day free trial to unlock the full solution →

The Indira Gandhi Canal was conceived primarily to bring irrigation to the arid Thar Desert region of Rajasthan, transforming dry, unproductive land into cultivable command area.

When Kanwar Sain conceived the Rajasthan Canal project in 1948, the vision was born out of a stark reality: vast stretches of western Rajasthan lay parched under the relentless sun of the Thar Desert, with temperatures climbing to 50°C and shifting sand dunes rendering the land largely unproductive. The region's potential remained locked behind the absence of a single critical resource—water. The canal, launched a decade later in 1958 and later renamed in honour of Indira Gandhi, was designed to unlock that potential by channeling water from the Harike barrage in Punjab across more than 9,000 km of canal network.

The scale of ambition reveals the core purpose. The project targeted a total culturable command area of 19.63 lakh hectares—nearly two million hectares of land that could be brought under cultivation if only water reached it. Roughly 70 percent of this area was planned for irrigation through flow systems, where gravity would do the work, while the remaining 30 percent would rely on lift systems to push water uphill against the natural slope. This was not a modest drinking-water supply scheme or an industrial water project; it was a comprehensive agricultural transformation initiative.

Note

The two-stage construction reflected the geographic and technical challenges. Stage-I covered the relatively gentler terrain of Ganganagar, Hanumangarh and northern Bikaner with 5.53 lakh hectares, while Stage-II pushed deeper into the harsh desert districts—Bikaner, Jaisalmer, Barmer, Jodhpur, Nagaur and Churu—adding another 14.10 lakh hectares of command area. …

Unlock everything free for 14 days

  • Full step-by-step solutions
  • Concept-first explanations
  • Methods, shortcuts & mistakes
  • PYQ mapping + timed mock tests

Full access for 14 days. No credit card required.