Question 47 of 78
Q.Most of wastage of material can be prevented if proper steps can be taken in connection with :
(a) Accounting
(b) inspection
(c) issuing
(d) purchasing
ChseodishaCHSE Odisha Plus Two (Class 12) Commerce Board 2022MCQ· 1mImportance★★★★★est
60% · 47/78 Questions
You're viewing a preview — the full solution, concept, methods & PYQ mapping are locked.
Start your 14-day free trial to unlock the full solution →Much material wastage happens during handling/issue, so proper steps at the issuing stage prevent most of it — option (c).
In this CHSE Odisha +2 Cost Accounting topic, material losses (wastage, spoilage, deterioration) often arise when materials are handled and issued from stores in wrong quantities, without proper requisition, or in improper order. Controlling the issue of mate …
Unlock everything free for 14 days
- Full step-by-step solutions
- Concept-first explanations
- Methods, shortcuts & mistakes
- PYQ mapping + timed mock tests
Full access for 14 days. No credit card required.