Q.Explain the direct labour cost method of absorption of factory overhead.
ChseodishaCHSE Odisha Plus Two (Class 12) Commerce Board 2019Subjective· 3mImportance★★★★★est
36% · 24/67 Questions
You're viewing a preview — the full solution, concept, methods & PYQ mapping are locked.
Start your 14-day free trial to unlock the full solution →Direct labour cost method absorbs overhead as a percentage of direct wages.
The direct (productive) labour cost method of absorbing factory overhead charges overhead to jobs in proportion to the direct wages they incur.
- Overhead rate = (Factory overhead ÷ Direct labour cost) × 100.
- Overhead charged to a job = that rate × the job's direct wages.
- Example: if factory overhead is Rs. 50,000 and direct wages Rs. 1,00,000, the rate is 50%; a job with Rs. 2,000 direct wages absorbs Rs. 1,000 overhead.
Merits: simple, data readily available from wage records, and suitable where labour is the dominant factor. …
Unlock everything free for 14 days
- Full step-by-step solutions
- Concept-first explanations
- Methods, shortcuts & mistakes
- PYQ mapping + timed mock tests
Full access for 14 days. No credit card required.