Question 39 of 67
Q.Give the causes of under/over-absorption of overheads.
ChseodishaCHSE Odisha Plus Two (Class 12) Commerce Board 2020Subjective· 3mImportance★★★★★est
58% · 39/67 Questions
You're viewing a preview — the full solution, concept, methods & PYQ mapping are locked.
Start your 14-day free trial to unlock the full solution →Under/over-absorption comes from wrong estimates of overhead or base, changed activity levels, and abnormal/seasonal factors.
Overhead is absorbed at a pre-determined rate = estimated overhead / estimated base. A difference from actual overhead (under- or over-absorption) can arise from:
- Wrong estimate of overhead - actual overhead expenses turn out higher or lower than the amount budgeted when the rate was set.
- Wrong estimate of the base - actual machine hours, labour hours, units or wages differ from the figures used to fix the rate.
- Change in activity/volume - actual output or operating level is above or below the budgeted (normal) capacity, so fixed overhead is over- or under-recovered.
- Unforeseen or seasonal changes - sudden changes in prices, methods, or seasonal fluctuations in production and cost not allowed for in the estimate. …
Unlock everything free for 14 days
- Full step-by-step solutions
- Concept-first explanations
- Methods, shortcuts & mistakes
- PYQ mapping + timed mock tests
Full access for 14 days. No credit card required.